The official tonnage-to-model map, the six specification drivers that move the quotation, and the cost lines that never appear on it.
TL;DR — take out robot cost at the 200–650 ton class, in five points
- We publish no take-out robot price list, and I am not going to put a currency figure on this page that I cannot verify from our own first-hand specification data.
- Three official model families cover a 200–650 ton machine: the SPRE3S(5D)900I and 900W class at 160–320 ton, the SPRE3S(5D)1100I and 1100W class at 250–470 ton, and the SPRE3S(5D)1300W telescopic class at 380–700 ton.
- Six drivers move the number inside the quotation: stroke and reach envelope, payload class, repeatability, servo platform and controller architecture, integration interface and end-of-arm tooling, and the engineering commitment behind the shipment.
- The installed cost is materially higher than the robot line, because installation, tooling, vision or in-mold labeling add-ons, guarding, spares, training and commissioning are quoted separately from the arm.
- Send us four numbers — machine tonnage, part weight including runner, cycle time, and the machine handshake protocol — and we return a model recommendation and a written quotation within one business day.
If you have been asked to price a take-out robot for a 200–650 ton injection molding machine and you have come away with three quotations that differ by a wide margin and cannot explain why, you are missing the cost model. A take-out robot in this tonnage band is not a catalogue item you look up a price for — it is a quotation against one of three published model families, and its cost is set by four things: the model class your tonnage forces on you, the reach envelope you need inside the mold, the integration scope you ask for, and the engineering time the supplier commits to after the crate lands.
The NBT take-out robot series: a telescopic vertical column on a floor-mounted base with a long transverse reach beam, built to reach into the open mold of a 200–650 ton injection molding machine. Full model gallery on the TAKE-OUT ROBOT SERIES product page.
This is the framework I walk injection molding automation buyers through at ROBOT (Ningbo) Intelligent Technology Co., Ltd., where my working life is spent on the practical performance of automation equipment rather than on catalogue copy. Our own published specification tables tell you which models carry your tonnage, and I have transcribed the coverage, stroke, reach, payload, take-out time, air consumption and weight below so that you can match quotations against facts instead of adjectives. The photographs of the line we build the cell around are on the take-out robot series page, and our injection molding robot arms category shows where each model sits in the lineup.
How Much Does a Take-Out Robot Cost for a 200–650 Ton Injection Molding Machine?
The honest answer is that a take-out robot for a 200–650 ton injection molding machine is quoted, not listed: the cost is a function of the model family your machine tonnage forces on you and of six specification drivers, and no responsible factory — ours included — publishes a single figure that applies to every configuration in that band. Every product page in our TAKE-OUT ROBOT SERIES catalogue ends with the same three lines: a full specification table, a payment-terms line reading T/T, L/C, PAYPAL, Western Union, and a request for a quotation.
That is not a marketing dodge, and I have watched buyers misread it for years. The same robot arm can cost very different amounts depending on four things:
- The model family your clamping tonnage forces on you. A 200-ton machine and a 650-ton machine sit in different published coverage windows, so we quote them from different families with different reach envelopes, drive platforms and net weights.
- The reach envelope you need inside the mold. Vertical stroke and transverse reach set the structural mass, the actuator class and the servo rating, so they move the quotation further than any cosmetic option.
- The integration scope you ask for. A robot standing alone at the machine, one handing parts to central conveying, and one feeding an in-mold labeling cell are three different scopes of supply, and we never let them be compared as one line.
- The engineering commitment behind the shipment. Commissioning on your floor, operator training, the recommended spares list and the service response afterwards are all part of the real cost of ownership, even when we quote them separately.
Because these four variables are the whole of the cost model, the most useful thing you can do before asking for a price is fix the model from the tonnage and the mold geometry, and then ask every supplier to quote against that identical configuration. A quotation you cannot compare line by line against another quotation is not a saving. It is an open question with a currency symbol attached to it.
The price you should expect to see quoted for a 200–650 ton take-out robot is the price of a robot class plus a reach envelope plus an integration scope plus a service commitment — and the only way to find out which of those four you are being sold is to read the quotation line by line.
Which Take-Out Robot Models Cover a 200–650 Ton Injection Molding Machine?
Three official model families apply to the 200–650 ton band, and the reason is that our published I.M.M. coverage windows overlap rather than tile: the 900 class covers 160–320 ton, the 1100 class covers 250–470 ton, and the 1300W telescopic class covers 380–700 ton. That overlap gives you a real choice of class at most tonnages, but it also means your tonnage alone does not determine your quotation.
| Model | Type | I.M.M. coverage | Vertical stroke | Transverse reach | Max load incl. gripper | Min. take-out time | Air consumption | Net weight |
|---|---|---|---|---|---|---|---|---|
| SPRE3S(5D)900I | Single stage | 160–320 ton | 900 mm | 1540 mm | 6 kg | 1.8 s | 1.0 NL/cycle (3S) · 1.7 NL/cycle (5D) | 248 kg (3S) · 270 kg (5D) |
| SPRE3S(5D)900W | Telescopic type | 160–320 ton | 900 mm | 1540 mm | 6 kg | 1.5 s | 1.0 NL/cycle (3S) · 1.7 NL/cycle (5D) | 256 kg (3S) · 290 kg (5D) |
| SPRE3S(5D)1100I | Single stage | 250–470 ton | 1100 mm | 1800 mm | 6 kg | 2.1 s | 1.0 NL/cycle (3S) · 1.7 NL/cycle (5D) | 298 kg (3S) · 320 kg (5D) |
| SPRE3S(5D)1100W | Telescopic type | 250–470 ton | 1100 mm | 1800 mm | 6 kg | 1.6 s | 1.2 NL/cycle (3S) · 1.8 NL/cycle (5D) | 316 kg (3S) · 340 kg (5D) |
| SPRE3S(5D)1300W | Telescopic type | 380–700 ton | 1300 mm | 2000 mm | 6 kg | 1.7 s | 1.2 NL/cycle (3S) · 1.8 NL/cycle (5D) | 356 kg (3S) · 380 kg (5D) |
| SPRT3S1100W | Open type, telescopic | 250–470 ton | 1150 mm | 1950 mm | 6 kg | 1.6 s | 1.2 NL/cycle | 450 kg |
| SPRT3S1300W | Open type, telescopic | 380–700 ton | 1390 mm | 1950 mm | 6 kg | 1.7 s | Published on the open-type table | 500 kg |
Source: ROBOT (Ningbo) published product specification tables for the 3-axis and 5-axis servo robot arms, the telescopic type series and the open-type series. Notation follows the original: 3S denotes the 3-axis configuration and 5D the 5-axis configuration. The SPRE series carries our official line “SUITABLE FOR 90–470T INJECTION MOLDING MACHINE LOAD 6KG”.
A 200-ton machine sits in the 900 class, a 400-ton machine sits in the 1100 class, and a 650-ton machine sits in the 1300W class — which means the transverse reach on your quotation should read 1540 mm, 1800 mm or 2000 mm respectively, and if it does not, you have been quoted the wrong class.
Two observations from that table will save you money in the first week. First, our telescopic configuration is faster than the single-stage configuration at the same reach: the published minimum take-out time is 1.5 s on the 900W against 1.8 s on the 900I, and 1.6 s on the 1100W against 2.1 s on the 1100I. Second, the open-type SPRT3S1000W class is the fastest unit in the published range at a 0.7 s minimum take-out time, because it is built for positioning rather than reach, and its 3 kg payload class tells you immediately that it is not a take-out robot in the same sense as the SPRE series.
Because cycle time on this product class is a configuration choice rather than a fixed property — our published figures span 0.7 s to 2.9 s across the same family — a buyer who assumes all take-out robots of a given tonnage perform the same way will size the cell against the wrong number. The published high-speed SPRT3S1200I unit covers 320–530 ton with a 10 kg payload class and a 2.9 s minimum take-out time at a 1000 kg net weight: more mass, more payload, a three-phase AC380V supply, and a slower published take-out time than the open-type unit.
The Six Cost Drivers That Set the Quotation
Six specification drivers explain almost all of the movement between two quotations on the same tonnage, and if you fix all six in writing before you ask for pricing, the quotations you receive become comparable for the first time. I take buyers through them in this order on a first call, because each one narrows the next one.
Driver 1 — Stroke and reach envelope
The reach envelope is the largest single cost driver in this band, because the vertical stroke has to exceed the mold-open stroke plus the part height plus the gripper clearance, and the transverse reach has to cover the mold face, the placement station and the downstream conveyor. Across our published line the vertical stroke runs from 700 mm on the 700 class to 1300 mm on the 1300W class, and the transverse reach from 1360 mm to 2000 mm over the same span. Because a longer reach envelope means more structural mass, a larger actuator and a higher servo rating, the reach figure moves the price further than any option on a quotation addendum.
Driver 2 — Payload class
Payload class is the second driver, and it is the one most often left unstated. Our published SPRE 3-axis and 5-axis series is rated LOAD 6KG across the 90–470 ton band; the open-type SPRT3S1000W class is rated 3 kg; the high-speed SPRT3S1200I class is rated 10 kg. Because the payload rating determines the gripper, the wrist bearing and the drive train, a quotation specifying a payload class well above your actual part weight plus gripper weight is charging you for capacity you will never use — so insist on the rating being written into the quotation, with your real part weight next to it.
Driver 3 — Repeatability and positioning class
Repeatability is the third driver, and I want to be straightforward: our published tables for the SPRE series carry stroke, gripper angle, maximum load including gripper, minimum take-out time, drive system, working air pressure, air consumption, the biggest power and the largest net weight — but they do not carry a repeatability figure. I have checked our own tables repeatedly on this point, because it is the specification engineers ask me about most often. So require every supplier, including us, to state position and path repeatability in writing against the ISO 9283 performance criteria and validation method, then validate it on your own floor with your own tooling. A verbal repeatability claim is not a specification.
Driver 4 — Servo platform and controller architecture
The fourth driver is the servo platform and the controller, and it is where the plant installation starts to appear in the cost. The published drive system across this line is an AC servo motor on X, Y and Z, with the controller running on AC220V ±10%, 12A, 50/60Hz single phase for the lower classes and AC380V ±10%, 12A, 50/60Hz three phase on the high-speed and three-phase variants. Because a three-phase supply changes the electrical installation scope at your plant, and a higher-tier controller changes the motion profile and recipe-changeover capability, the controller architecture is a cost driver even when the arm looks identical in the photographs.
Driver 5 — Integration interface and end-of-arm tooling
The fifth driver is the integration interface, and it is the one that most often separates two quotations that otherwise look identical. Our published tables document the drive system, the working air pressure of 5–7 kgf/cm² and the air consumption in NL per cycle, but they do not name the injection molding machine handshake protocol in the specification line — so require the protocol to be stated in writing, alongside the end-of-arm tooling scope. Because the handshake protocol and the tooling determine whether the robot can run your full part portfolio or only one part, the cheapest robot in the comparison is frequently the one that needs custom tooling for every job you run.
Driver 6 — Engineering, commissioning and service commitment
The sixth driver is the engineering commitment behind the shipment, and it is the only driver a buyer can verify almost entirely from the supplier’s behaviour before any money changes hands. Ask what commissioning on your floor is included, how many days of operator training are included, what the recommended spares list is, and what the warranty and service response are. Because a quotation carrying a clear service commitment reduces the risk of a six-figure line stopping, while a quotation without one transfers that risk entirely to your plant, the commitment is a cost even though it never appears as a number.
Six drivers — reach envelope, payload class, repeatability, servo platform and controller, integration interface and tooling, and the engineering commitment — account for essentially all of the difference between two quotations on the same 200–650 ton machine.
What Is Not in the Take-Out Robot Quotation
The most common sourcing error I see in this band is comparing the robot line from one supplier against the robot line from another, when each supplier has quietly scoped a different amount of work into that line. Here is what is normally outside it, and what I ask every buyer to put on a separate schedule before comparing quotations.
- Installation and mechanical set-up. The robot arrives as a machine, not as an installed cell, so foundation work, levelling, guarding and the physical set-down are quoted separately.
- End-of-arm tooling. The gripper, vacuum generation, suction cups or needles and the quick-change tooling interface are a separate line, and they change every time you change part.
- Vision and in-mold labeling add-ons. Camera, lighting, label feeding and the matching cell logic are quoted as options, and they belong to the robot for IML scope rather than to the standard arm. Because the label is placed while the part is still hot, an IML cell should be quoted as a cell, not as a robot with an option.
- Safety guarding and the cell perimeter. The guarding solution must satisfy the industrial robot safety requirements of ISO 10218-1 and the robot system requirements of ISO 10218-2; in North America the equivalent ANSI/A3 R15.06 framework applies, alongside the electrical requirements of IEC 60204-1.
- Spares, training and commissioning. The recommended spares list, the training days and the on-floor commissioning effort are real costs that sit outside the arm.
- Running cost: compressed air and power. Our published air consumption of 1.0 to 1.8 NL per cycle across the SPRE line, and 2.0 NL per cycle on the open-type SPRT3S1000W, is a cost per year and not per machine, and it is the figure most often ignored when a buyer builds a payback case.
The practical consequence
The installed cost of a take-out robot in the 200–650 ton band is materially higher than the robot line, and the gap is driven by scope rather than by price. That is not a criticism of any supplier — it is a consequence of how the industry quotes — but it does mean a comparison made on the robot line alone compares two different scopes. Ask for the line-item schedule, make every supplier quote against the same schedule, and the quotations become readable in an afternoon.
How to Compare Take-Out Robot Quotations Line by Line
This is the sequence I use on every first call, and it is the reason buyers tell me their comparison finally made sense once they had it in front of them. Work through it in order, because each step removes an ambiguity that makes the next step meaningless.
- Fix the model family from the clamping tonnage, the part weight and the mold-open stroke. Match those three numbers against our published coverage windows of 90–200 ton, 160–320 ton, 250–470 ton and 380–700 ton, and put your tonnage in writing on every request.
- Lock the reach envelope against the real mold geometry. Require the vertical stroke and the transverse reach as numbers, and check that the vertical stroke exceeds the mold-open stroke plus the part height plus the gripper clearance.
- Check the payload class against your real part weight. Compare our published rating of 6 kg for the SPRE series, 3 kg for the open-type SPRT3S1000W and 10 kg for the high-speed SPRT3S1200I against your part weight plus gripper weight, and reject any quotation that leaves the rating unstated.
- Require repeatability in writing against ISO 9283. Ask for position and path repeatability on the published test method, and treat a verbal claim as no claim at all.
- Lock the interface, the electrical supply and the air envelope. Require the machine handshake protocol to be named, the controller supply to be specified, and the air consumption in NL per cycle to be stated, because these three figures drive the installation scope and the running cost.
- Get the installed scope, the spares list and the service commitment in the same document. Separate the robot, the controller, the tooling, the installation, the guarding, the training, the spares and the commissioning onto individual lines, and add the warranty period and the service response.
How to Estimate the Payback Without a Published Price
You do not need a published price to build a defensible payback case — you need four measured inputs and a running-cost model, and I would rather show you the method than hand you a number I cannot stand behind. Here is the structure I use with buyers who have to present a case to their own management.
Step one: establish the cycle-time input from our published data and then from your own floor. The published minimum take-out time for the class you are quoting gives you a floor — 1.8 s on the 900I, 1.6 s on the 1100W, 1.7 s on the 1300W — and your own measured cycle on the real machine gives you the number that matters, because the robot must fit inside the cycle rather than beside it.
Step two: count the operator positions the cell removes. This is the largest single benefit and the easiest to overstate, so count positions rather than operators, and count the positions that genuinely disappear rather than the ones that merely change.
Step three: build the running-cost side from the published figures. Air consumption in NL per cycle multiplied by cycles per year multiplied by your compressed air unit cost gives the air bill; add controller power, the spares list and the maintenance hours. Because a robot consuming 1.8 NL per cycle on a fast cycle can cost more in compressed air over five years than a cheaper robot costs in energy, the running-cost model is what separates a good investment from an expensive one.
Step four: divide the installed cost by the net annual benefit. Net annual benefit is the labour and scrap avoided minus the running cost, and the result is a payback period in months. Present the installed cost, not the robot line, because the installed cost is what leaves your bank account. And run the same model against two configurations, because the comparison that justifies the higher-class robot is almost always the one with the faster take-out time and the shorter payback — not the one with the lower quotation.
A payback case built from published take-out times, published air consumption, your own labour rate and your own cycle time is more defensible to management than any published price band, because every input can be checked and defended in the meeting.
Frequently Asked Questions About Take Out Robot Cost for a 200–650 Ton Injection Molding Machine
1. How much does a take out robot cost for a 200–650 ton injection molding machine?
A take-out robot in the 200–650 ton class is quoted against a specific model and configuration rather than looked up in a catalogue, and the price is set by four things: the model family your clamping tonnage forces on you, the reach envelope you need inside the mold, the integration scope you ask for, and the engineering time the supplier commits to after the crate lands. Because we publish the specification tables rather than a price list, the defensible way to price this band is to fix the model from the tonnage mapping first, then compare quotations line by line on an identical specification.
2. Which take-out robot models cover a 200–650 ton injection molding machine?
Three official model families apply. The SPRE3S(5D)900I single-stage and SPRE3S(5D)900W telescopic class covers 160–320 ton, the SPRE3S(5D)1100I single-stage and SPRE3S(5D)1100W telescopic class covers 250–470 ton, and the SPRE3S(5D)1300W telescopic class covers 380–700 ton. A 200-ton machine sits in the 900 class, a 400-ton machine in the 1100 class, and a 650-ton machine in the 1300W class, and the transverse reach should read 1540 mm, 1800 mm or 2000 mm accordingly.
3. Why does the manufacturer not publish a take-out robot price?
Because the robot is configured against your mold, your injection molding machine and your plant interface, so a single number would mislead rather than inform. Every product page in our catalogue resolves to a published specification table, a payment-terms line and a quotation request. We publish the engineering data instead, because that is what lets you compare two quotations honestly, and because an invented price band produces a buyer who budgets wrongly and then blames the robot.
4. What is normally excluded from a take-out robot quotation?
The robot quotation normally covers the arm, the controller and the standard documentation. Installation and mechanical set-up, end-of-arm tooling, vision and in-mold labeling add-ons, safety guarding, the recommended spares list, operator and maintenance training, and integration with central conveying or granulation equipment are normally quoted separately. Ask for a written line-item schedule covering each of them, because the installed cost is materially higher than the robot line and a comparison made on the robot line alone compares two different scopes.
5. Is a 5-axis take-out robot worth the extra cost on a 400-ton machine?
Only if your part profile needs it. The fifth axis earns its place when you load inserts, pick parts out of a deep cavity, or place parts with an orientation change inside the mold, and it is visible in our published data as a heavier unit — the 5-axis net weight is consistently 20 to 40 kg above the 3-axis equivalent on the same model. On a simple straight pick-and-place part at a moderate cycle time, a 3-axis machine in the same reach class delivers the same part in the same cycle, and the extra axis becomes cost with no floor benefit.
6. What is the difference between a single-stage and a telescopic take-out robot?
A single-stage robot uses a fixed vertical column, so the column height is set by the machine and the unit sits on the floor beside the mold. A telescopic robot extends the vertical axis inside the mold opening, so it reaches deep into a tall cavity without growing taller than the machine. On our published data the telescopic 700W class reaches a 1.3 second minimum take-out time against 1.7 seconds on the single-stage 700I, and the 900W class reaches 1.5 seconds against 1.8 seconds on the 900I, so the telescopic configuration is the faster of the two at the same reach.
7. What documentation should I request before comparing quotations?
Request the model and the full configuration sheet, the published specification table for that model, the position and path repeatability stated in writing against the ISO 9283 test method, the machine handshake protocol, the air consumption in NL per cycle, the electrical supply requirement, the weight, the recommended spares list, and a written commissioning and training scope. If a supplier cannot supply repeatability in writing, treat that as a commercial risk rather than a technical one, and if it cannot supply the air consumption figure, treat that as an incomplete quotation.
8. How do I estimate the payback on a take-out robot without a published price?
Build the estimate from four measured inputs: the cycle-time improvement the robot delivers, the number of operator positions it removes, the hours your line runs each year, and the labour rate at your own site. Subtract the running cost of compressed air, power, spares and maintenance from the annual benefit, then divide the installed cost by the net annual benefit. Use our published minimum take-out time as the starting point for the cycle-time input and then measure your own cycle on the floor, because the robot has to fit inside the cycle rather than beside it.
How to Get a Model Recommendation and a Written Quotation
Send me four numbers and I will send you back a model recommendation and a written quotation within one business day. The four numbers are the clamping tonnage of your injection molding machine, the part weight including the runner, your current cycle time, and the handshake protocol your machine controller speaks. Add the mold-open stroke and the placement distance if you have them, because those two figures settle the reach envelope immediately and remove the largest source of variation between quotations.
If you would rather browse first, our take-out robot series gallery shows the configurations, the 3-axis and 5-axis servo robot arms page carries the standard specification tables, the telescopic type page covers the deep-cavity configurations, and the high-speed robot page covers the fastest take-out units in the line. Our downloadable catalogue is on the download page, and the contact page is where the specification goes.
Focuses on practical molding solutions for global factories. ROBOT (Ningbo), established in 2004, specializes in plastic injection molding automation equipment — from hopper dryers and auto loaders to servo robot arms, central conveying systems, and turnkey plant planning. As Technical Director, Mr. Chen focuses on the real-world performance of automation equipment — cycle time, uptime, and the specifications that actually matter on the production floor.
Ready to price a take-out robot for your 200–650 ton machine?
Get take-out robot factory pricingSend your machine tonnage, part weight, cycle time and handshake protocol — we will respond with a model recommendation and a written quotation within one business day.
Post time: Oct-27-2026