Take Out Robot Price in China: 7 Questions to Ask Before Your RFQ

Take Out Robot Price in China: 7 Questions to Ask Before Your RFQ

We publish no take-out robot price list, and I am not going to put a currency figure on this page that I cannot verify from our own first-hand specification data. That is not a dodge. A take-out robot is not a catalogue item you look up a price for. It is a quotation against a specific model family, a reach envelope and an integration scope, and because those three differ between suppliers, a single number would mislead. What I can do is give you the seven questions that make two quotations comparable, and the data behind each.

  • Question 1: which model family does my clamping tonnage force on me? For a 200–650 ton machine, three published families apply, and their coverage windows overlap.
  • Question 2: what reach envelope do I need inside the mold? Vertical stroke and transverse reach set the structural mass, actuator class and servo rating, so they move the price further than any option.
  • Question 3: what is the payload class, and is it written down? Our published SPRE series is rated 6 kg across the 90–470 ton band. A quotation that leaves the rating unstated cannot be compared.
  • Question 4: will the supplier state repeatability in writing? Our own published tables carry no repeatability figure, so we ask every supplier including us to state it against a named test method.
  • Question 5: what is the controller supply and the air consumption? AC220V ±10%, 12 A, 50/60 Hz single phase on the lower classes, AC380V three phase on the high-speed variants. Air consumption of 1.0 to 1.8 NL per cycle is a running cost.
  • Question 6: what is excluded from the robot line? Installation, tooling, vision or in-mold labeling, guarding, spares, training and commissioning are quoted separately, and that is where the installed cost hides.
  • Question 7: what is the service commitment behind the shipment? It is the one driver a buyer can verify before money changes hands, and it never appears as a number.

The published model map, and why your tonnage alone does not fix your price

Three model families cover a 200–650 ton machine, because our published I.M.M. coverage windows overlap rather than tile. The 900 class covers 160–320 ton, the 1100 class covers 250–470 ton, and the 1300W telescopic class covers 380–700 ton. That overlap gives you a choice of class, but your tonnage alone does not fix your quotation.

Published take-out robot specifications: SPRE model families
Model Type I.M.M. coverage Vertical stroke Transverse reach Max load incl. gripper Min. take-out time Net weight
SPRE3S(5D)900I Single stage 160–320 ton 900 mm 1540 mm 6 kg 1.8 s 248 kg (3S) / 270 kg (5D)
SPRE3S(5D)900W Telescopic 160–320 ton 900 mm 1540 mm 6 kg 1.5 s 256 kg (3S) / 290 kg (5D)
SPRE3S(5D)1100I Single stage 250–470 ton 1100 mm 1800 mm 6 kg 2.1 s 298 kg (3S) / 320 kg (5D)
SPRE3S(5D)1100W Telescopic 250–470 ton 1100 mm 1800 mm 6 kg 1.6 s 316 kg (3S) / 340 kg (5D)
SPRE3S(5D)1300W Telescopic 380–700 ton 1300 mm 2000 mm 6 kg 1.7 s 356 kg (3S) / 380 kg (5D)

A 200-ton machine sits in the 900 class, a 400-ton machine in the 1100 class, and a 650-ton machine in the 1300W class. That means the transverse reach on your quotation should read 1540 mm, 1800 mm or 2000 mm respectively, and if it does not, you have been quoted the wrong class. The table comes from our published specification tables for the servo robot arms and telescopic series.

Two observations from that table will save you money in week one. First, our telescopic configuration is faster than the single-stage one at the same reach: the published minimum take-out time is 1.5 s on the 900W against 1.8 s on the 900I, and 1.6 s on the 1100W against 2.1 s on the 1100I. A single-stage robot uses a fixed vertical column, so its height is set by the machine and it sits on the floor beside the mold; a telescopic robot extends the vertical axis inside the mold opening, reaching into a tall cavity. Second, cycle time on this product class is a configuration choice rather than a fixed property — our published figures span 0.7 s to 2.9 s across the same family — so a buyer who assumes all take-out robots of a given tonnage perform alike will size the cell against the wrong number.

Take out robot for injection molding machine, single-stage column with long transverse reach beam in white and red, floor-mounted beside the machine
Our take-out robot series: a telescopic vertical column on a floor-mounted base with a long transverse reach beam, built to reach into the open mold of a 200–650 ton injection molding machine.

Question 4 is the one that catches people, and it catches us too

Repeatability is the third cost driver, and I want to be straightforward about it: our published tables for the SPRE series carry stroke, gripper angle, maximum load including gripper, minimum take-out time, drive system, working air pressure, air consumption and net weight — but they do not carry a repeatability figure. I have checked our own tables repeatedly, because it is what engineers ask me most.

So require every supplier, including us, to state position and path repeatability in writing against a named performance criteria and validation method, and then validate it on your own floor with your own tooling. A verbal repeatability claim is not a specification, and a supplier who cannot supply repeatability in writing is telling you something about their supply chain.

That principle extends to the integration interface. Our published tables document the drive system, the working air pressure of 5–7 kgf/cm² and the air consumption in NL per cycle, but they do not name the injection molding machine handshake protocol — so require it in writing, alongside the end-of-arm tooling scope. Because the protocol and the tooling decide whether the robot runs your full part portfolio or one part, the cheapest robot in the comparison is often the one needing custom tooling for every job.

What the robot line does not include

The most common sourcing error I see in this band is comparing the robot line from one supplier against the robot line from another, when each has quietly scoped a different amount of work into that line. Here is what is normally outside it, and what I ask buyers to put on a separate schedule.

Installation and mechanical set-up. The robot arrives as a machine, not as an installed cell, so foundation work, levelling, guarding and the set-down are quoted separately. End-of-arm tooling. The gripper, vacuum generation, suction cups and the quick-change tooling interface are a separate line, and they change every time you change part. Vision and in-mold labeling add-ons. Camera, lighting, label feeding and the matching cell logic are quoted as options. Because the label is placed while the part is hot, an IML cell should be quoted as a cell, not a robot with an option.

Safety guarding and the cell perimeter. According to the Occupational Safety and Health Administration’s robotics overview, industrial robots are programmable multifunctional mechanical devices used to perform unsafe, hazardous and highly repetitive tasks, and studies indicate that many robot accidents occur during non-routine operating conditions such as programming, maintenance, testing or setup, during which the worker may be within the robot’s working envelope. That is why the guarding is part of the investment, not an accessory. Electrical requirements for the cell are the next line, and according to the IEC webstore entry for IEC 60204-1:2016, that standard applies to electrical, electronic and programmable electronic equipment to machines not portable by hand while working, and the equipment covered commences at the point of connection of the supply to the machine. Because a three-phase AC380V supply changes the electrical installation scope at your plant, the supply requirement is a quotation line.

Spares, training and commissioning, and the running cost of compressed air and power. Our published air consumption of 1.0 to 1.8 NL per cycle across the SPRE line is a cost per year, not per machine. The installed cost is materially higher than the robot line, and the gap is driven by scope, not price. Ask for the line-item schedule, make every supplier quote against it, and the quotations become readable in an afternoon.

Do you need a take-out robot at all?

The question is not which machine is better but whether your cell needs a runner take-out or a part-placement system, because the second costs more for a reason visible in the published data. A sprue picker is a single-stage pneumatic unit that reaches into the open mold, takes the sprue runner and the part off the parting line, and drops them clear. Our published cylinder line covers 90–470 ton machines with a 6 kg load, a 610–730 mm vertical stroke and a 150 mm crosswise stroke, at 68 kg net.

A take-out robot does that job and then keeps working after it: it places the part in a box, on a conveyor, into a fixture, or into the mold for in-mold labeling or assembly. The capital gap is structural — the sprue picker is 68 kg net with a pneumatic drive, while the listed servo take-out robots run from 228 kg to 350 kg net, and the published utilities are identical on both sides at 5–7 kgf/cm² air and AC 220 V ±10%, 12 A, 50/60 Hz single phase. The gap is not the power supply, it is the machine.

A sprue picker pays off when the cell has a simple take-out job, one machine, a stable runner layout and someone on the floor to clear jams. The honest limitation is that a sprue picker has a fixed motion, so a new part with new runner geometry can mean a new fixture, a program or a new unit — and that is where a servo unit starts to earn its place.

Building the payback case without a published price

You do not need a published price to build a defensible payback case — you need four measured inputs and a running-cost model. The test is a ratio: payback months = total investment ÷ monthly saving, so a 12-month payback means the investment must not exceed twelve months of saving. Read that as a ceiling on what the robot may cost you, and it becomes a specification, not a negotiation.

Step one: measure the time you actually lose. Stopwatch a hundred consecutive cycles and log the seconds an operator spends at the machine, then subtract the published take-out time. Our minimum take-out times are 1.7 s on the 700I at 90–200 ton, 1.8 s on the 900I at 160–320 ton, 2.1 s on the 1100I at 250–470 ton, and 1.9 s on the 1100I 10 kg series. These are minimums, so best case at a set speed, not the average a cell sees with real parts; and if the machine never waits for the operator, recoverable seconds are zero.

Step two: count positions, not operators, because this is the largest single benefit and the easiest to overstate. Model released time as redeployed hours rather than headcount, because redeployed hours survive a conversation with a production manager and headcount does not. Step three: price two saving lines separately. Released operator hours are worth your loaded hourly cost, but only where the freed time has a defined destination. Recovered capacity is worth contribution per part, and only where demand exists — a plant already selling everything it makes cannot monetise a faster cycle.

Step four: divide the installed cost by the net annual benefit. The investment side is the robot plus tooling, installation and commissioning, safety guarding, mould-side changes, training, and the machine hours lost installing. Present the installed cost, not the robot line, because that is what leaves your account. And run the model against two configurations, because the comparison that justifies the higher-class robot is the one with the faster take-out time.

Frequently asked questions about take out robot price in China

How much does a take out robot for an injection molding machine cost in China?

A take-out robot in this class is quoted against a specific model and configuration rather than looked up in a catalogue. The price is set by the model family your clamping tonnage forces on you, the reach envelope you need inside the mold, the integration scope you ask for, and the engineering time the supplier commits to after the crate lands. The defensible way to price it is to fix the model from the tonnage mapping first, then compare quotations line by line.

Which take out robot model should I ask for?

For a 200–650 ton machine, three published families apply. The SPRE3S(5D)900I and 900W class covers 160–320 ton, the SPRE3S(5D)1100I and 1100W class covers 250–470 ton, and the SPRE3S(5D)1300W telescopic class covers 380–700 ton. A 200-ton machine sits in the 900 class, a 400-ton machine in the 1100 class and a 650-ton machine in the 1300W class, and the reach should read 1540 mm, 1800 mm or 2000 mm accordingly.

What is normally excluded from a take out robot quotation?

The robot quotation normally covers the arm, controller and standard documentation. Installation and mechanical set-up, end-of-arm tooling, vision and in-mold labeling add-ons, safety guarding, the spares list, operator training, and integration with central conveying or granulation equipment are quoted separately. Ask for a written line-item schedule covering each of them, because a comparison made on the robot line alone compares two different scopes.

What documentation should I request before comparing quotations?

Request the model and full configuration sheet, the published specification table, position and path repeatability stated in writing against a named test method, the machine handshake protocol, air consumption in NL per cycle, the electrical supply requirement, the weight, the recommended spares list, and a written commissioning and training scope. If a supplier cannot supply repeatability in writing, treat that as a commercial risk, not a technical one.

About the author

Mr. Chen is Technical Director at ROBOT (Ningbo) Intelligent Technology Co., Ltd., working on practical molding solutions for global factories since the company was established in 2004. ROBOT (Ningbo) specialises in plastic injection molding automation, from hopper dryers and auto loaders through servo robot arms and central conveying to turnkey plant planning. His focus is the real-world performance of automation equipment: cycle time, uptime and the specifications that matter on the floor.

Contact: Mr. Chen, Technical Director · Email sales19@nbrobot.com · Phone 0086-574-22709760 · yanni@nbrobot.com

Address: No. 2 Oufu Road, Taishang Industrial Park, Yuyao, Ningbo, China · Office hours Monday to Friday, 9am to 6pm

More from NBT: contact us · take-out robot series · 3 and 5 axis servo robot arms · robot arm products · about us · factory tour · FAQs · Facebook


Post time: Nov-24-2026