Sprue Picker vs Take Out Robot: Price Difference and When Each Pays Off

One removes the sprue and the part with air. The other decides where the part goes next. The price gap follows from that difference, so this compares two different jobs, not two quotes.

Short answer

  • A sprue picker is a pneumatic unit that pulls the runner and part from the mold; a take-out robot is a servo system that also places the part, with published loads up to 90 kg including gripper.
  • The capital gap is structural: the sprue picker is 68 kg net with a single-stage pneumatic drive, while the listed servo take-out robots run from 228 kg to 350 kg net.
  • Both run on the same published utilities, 5–7 kgf/cm² air and AC 220 V ±10%, 12 A, 50/60 Hz single phase.
  • No list price is published for either unit, so compare configuration, integration and guarding work, and quote each cell separately.

The price difference between a sprue picker and a take-out robot is not a margin decision, it is a different machine answering a different question: the sprue picker removes the sprue and the part, while the take-out robot decides what happens to it afterwards. Our published sprue picker cylinder model line covers 90–200 t and 90–250 t machines with a 6 kg load, pneumatically driven and 68 kg net, while the servo take-out robot range starts at the same tonnage, runs to 470 t, carries up to 90 kg including gripper and weighs 228 kg to 350 kg net. Because the published specifications differ by that much, the two units belong to different capital bands, and any price you are quoted is a configuration quote rather than a list price.

What is the actual price difference between a sprue picker and a take-out robot?

We publish specifications and quote per configuration, so there is no first-party list price to reproduce here, and we are not going to invent one. What we can do is show you why the gap exists. A sprue picker is a single-stage pneumatic unit: plant air at 5–7 kgf/cm², one small motor group, a light frame at 68 kg net. A servo take-out robot adds AC servo drives on X, Y and Z, a five-axis option, a heavier frame and a published envelope of roughly 2,020 mm to 2,610 mm in the C dimension, against 1,290 mm to 1,410 mm on the sprue picker.

Those are the cost drivers, and they are why the take-out robot sits in a materially higher capital band: drives, structure, footprint and the integration work that follows. The published utilities are identical on both sides, 5–7 kgf/cm² air and AC 220 V single phase, so the gap is not a different power supply, it is the machine.

What moves a quote inside either band is the configuration: tonnage, payload, axes, tooling, in-mold labeling or assembly options, the guarding interface, controller signals and commissioning effort.

What does each unit actually do on the machine?

A sprue picker does one job: it reaches into the open mold, takes the sprue runner and the part off the parting line, and drops them clear of the machine area. The published cylinder line is built for 90–470 t machines with a 6 kg load, a 610 mm to 730 mm vertical stroke and a 150 mm crosswise stroke, covering the runner take-out position on most machines in that class.

Pneumatic sprue picker cylinder model with vertical column and gripper mounted beside an injection molding machine
The sprue picker cylinder model: a single-stage pneumatic take-out unit beside the machine.

A take-out robot does that job and then keeps working after it: it places the part in a box, on a conveyor, into a fixture, or into the mold for in-mold labeling or assembly. Our published servo range covers 90–470 t machines, with a 700 mm to 1,100 mm vertical stroke, a maximum load of 90 kg including gripper, and a published minimum take-out time of 6 s on the 700I and 10 s on the 900I.

So the question is not which machine is better but whether your cell needs a runner take-out or a part-placement system, because the second costs more for a reason visible in the published data.

How do the published specifications compare?

Here is the published comparison, taken from our own product pages, so every cell can be checked.

Published sprue picker and take-out robot specifications. All figures are manufacturer published, not test results from this article.
Dimension Sprue picker, cylinder type Take-out robot, 3 and 5 axis servo
Published machine coverage SPRSS600I 90–200 t, SPRSS700I 90–250 t, SPRS1S600I 90–200 t; page states suitability for 90–470 t SPRE3S(5D)700I 90–200 t, 900I 160–320 t, 1100I 250–470 t
Published load 6 kg load stated on the page Up to 90 kg maximum load including gripper
Axes and drive Single stage, pneumatic X, Y, Z AC servo motors, 3 or 5 axis
Vertical stroke 610 mm, 730 mm, 670 mm 700 mm, 900 mm, 1,100 mm
Crosswise stroke 150 mm 3S 680–1,080 mm, 5D 540–940 mm
Published take-out time Not published per model 6 s on the 700I, 10 s on the 900I
Working air pressure 5–7 kgf/cm² 5–7 kgf/cm², 1.0–1.7 NL/cycle
Electrical power AC 220 V ±10%, 12 A, 50/60 Hz, single phase AC 220 V ±10%, 12 A, 50/60 Hz, single phase
Net weight 68 kg 228 kg to 350 kg across the models
Published envelope A 270–330 mm, I 1,290–1,410 mm A 1,585–2,000 mm, C 2,020–2,610 mm

Read the load row first, because it decides whether the higher band is justified at all. If your parts and runners weigh a few kilograms, our published 6 kg specification covers the job and the 90 kg rating is headroom you pay for. If the cell needs the part placed, labeled in the mold or boxed automatically, the sprue picker cannot do it and the comparison is no longer about price.

When does a sprue picker pay off?

A sprue picker pays off when the cell has a simple take-out job, one machine, a stable runner layout and someone on the floor who can clear a jam. The published cylinder models cover 90–200 t and 90–250 t machines, so most shops are covered without moving up a band.

Because the drive is pneumatic, there are no servo drives to age, no homing routine to re-learn after a power cut and fewer parameters for the maintenance team. The air supply at 5–7 kgf/cm² is usually already in the plant, which is why installation is short.

The honest limitation: a sprue picker has a fixed motion, so a new part with new runner geometry can mean a new fixture, a program or a new unit, and that is where a servo unit starts to earn its place.

When does a take-out robot pay off?

A take-out robot pays off when the value of the cell is in output per hour and in nobody standing at the machine. The published minimum take-out time of 6 s on the 700I and 10 s on the 900I is the number to test against your actual cycle, because a robot that presents parts faster than the machine fills them changes the schedule.

The second case is placement. In-mold labeling, in-mold assembly, trimming, stacking into boxes, feeding a downstream process and taking parts clear of the guarded area all sit in the take-out robot’s scope, and they are why our range goes to 90 kg payload and five axes.

Because a servo unit must be integrated rather than simply installed, the extra capital is recovered only when the cell runs more hours or does more work than a runner take-out can absorb.

What safety and compliance work comes with the higher capital band?

Whichever unit you choose, it reaches into the mold, so guarding and energy-control work on the cell is part of the decision, not an afterthought.

In the United States, the general machine guarding rule of OSHA 1910.212 requires that one or more methods of guarding be provided to protect operators and other employees in the machine area from hazards such as point of operation, ingoing nip points, rotating parts, flying chips and sparks, and it lists barrier guards, two-hand tripping devices and electronic safety devices among the accepted methods. Adding a robot arm inside the guard therefore changes the guarding layout, safe positions and reset logic, and that work belongs inside the quotation rather than after it.

Energy control is the other half: according to OSHA 1910.147, the lockout/tagout standard covers servicing and maintenance of machines where unexpected energization or startup, or release of stored energy, could cause injury, and it sets minimum performance requirements for controlling that energy. For the European Union, the Machinery Directive 2006/42/EC governs the essential health and safety requirements for machinery placed on the market, and the European Commission confirms that Machinery Regulation (EU) 2023/1230, adopted on 14 June 2023, applies on a mandatory basis as of 20 January 2027. A supplier who cannot describe the safe positions, the guarding interface and the controller handshake should not be in the quotation.

How do you compare quotations so that they are like for like?

Most sprue picker versus take-out robot comparisons fail because the quotations cover different scope, so a seven-point specification sheet settles most of it before money is discussed.

  1. State the machine tonnage and platen dimensions, because that fixes which published model family applies.
  2. State the weight of the part and runner, so payload is quoted against real numbers, not a catalogue maximum.
  3. State the required cycle time and where the part must be presented.
  4. List every function required: runner take-out, part placement, in-mold labeling, trimming or box handling.
  5. Require the interface list: machine signals, safety relays, guarding interface, and who does the PLC work.
  6. Ask what the quotation includes: delivery, installation, commissioning, training, spares and a stated support window.
  7. Ask for the conformity documents for the destination market and the manual supporting the risk assessment.

Because both units share the same published utilities, any quotation with a separate power or air upgrade for the robot is worth questioning.

Which one should you choose?

Choose the sprue picker when the cell needs a runner take-out and a person is available to clear it, and the take-out robot when the cell needs placement, in-mold work or unattended hours.

Choose a sprue picker when: the cell runs one or two machines, the runner layout is stable, and an operator can lift the parts clear of the guarded area; you want the lower capital band and a machine that runs on plant air you already have.

Choose a take-out robot when: the cell has to place parts, label in the mold, assemble in the mold, or run without an operator at the machine; the published 6 s to 10 s take-out time is shorter than your cycle and the extra hours are worth more than the extra capital.

Where neither is right: a very heavy part or unusually long runner on a small machine, a cell with frequent runner geometry changeovers, or a line where the bottleneck is the machine itself rather than the take-out.

My position as Technical Director is simple: I will not quote a take-out robot to solve a problem a sprue picker already solves, nor a sprue picker for a cell that needs in-mold labeling.

Frequently asked questions

How much more does a take-out robot cost than a sprue picker?

Our pages publish specifications, not list prices, so the honest answer is a capital band. A pneumatic sprue picker is a 68 kg single-stage unit, while the servo take-out robots run from 228 kg to 350 kg net with AC servo drives on X, Y and Z, so the gap comes from drives, structure and integration. Ask for a quotation for your cell.

Is a sprue picker enough for a 200-ton injection molding machine?

Yes on tonnage. The published cylinder line includes the SPRSS600I for 90–200 t and the SPRSS700I for 90–250 t, with a 6 kg load, and the same page states suitability for 90–470 t machines. The limit is what your parts weigh and whether somebody takes them out.

What can a take-out robot do that a sprue picker cannot?

Placement. The servo take-out robot carries up to 90 kg including gripper, has a 700 mm to 1,100 mm vertical stroke and adds axes for in-mold labeling, in-mold assembly, trimming and boxing. A sprue picker has a fixed motion and removes the sprue and part; it does not decide where the part goes next.

Should the robot run inside the machine guard?

On a molding machine the take-out unit works inside the guarded area, and adding it changes the guarding layout and safe positions. OSHA’s machine guarding rule requires guarding against point of operation, nip points and flying chips, and lockout/tagout covers energy control, so the guarding interface and controller handshake belong in the quotation.

Which unit suits a cell that has to run unattended at night?

A servo take-out robot, because it presents parts without an operator and can feed a downstream process. The published minimum take-out time is 6 s on the 700I and 10 s on the 900I, so compare it against your actual cycle time. A sprue picker still works when someone is on the floor.

Summary

The sprue picker and the take-out robot are not alternatives at one price point, and our published specifications explain why. The pneumatic sprue picker is a 68 kg single-stage unit for 90–250 t machines with a 6 kg load, while the servo take-out robot covers 90–470 t, carries up to 90 kg including gripper, presents a part every 6 s to 10 s and weighs 228 kg to 350 kg net. Both run on the same 5–7 kgf/cm² air and AC 220 V single phase power, so the capital difference is drives, structure, footprint and integration. Specify the job first, quote the configuration second, and treat guarding and the controller interface as part of the machine.

Talk to ROBOT (Ningbo) for the sprue picker and take-out robot ranges, a quotation against your cell, or a whole plant plan covering dryers, loaders and conveying.

Mr. Chen

Technical Director, ROBOT (Ningbo) Intelligent Technology Co., Ltd

ROBOT (Ningbo) was established in 2004, specializing in plastic injection molding automation equipment. From hopper dryers and auto loaders to servo robot arms, central conveying systems and turnkey plant planning, we help factories worldwide improve efficiency with field-proven solutions. As Technical Director, I focus on cycle time, uptime and the specifications that matter on the floor.

Last verified: 2026-11-17. Figures reflect the ROBOT (Ningbo) published specifications, company profile and referenced regulations available on that date; re-confirm the current specification sheet.